HomeEquipment AssemblyHydrostatic TestingNitrogen Gas TestingRefurbishmentPre-Mob TestingSystem Integration Test (S.I.T.)QHSEContact Info

EMSTECH have the ability for fast turnaround on all types of Pre-Mobilisation equipment to meet customers tight delivery deadlines at short notice.

5 1/8" 10M Surface Tree Pre-Mob
Hydrostatic & Nitrogen Gas Tested

PMTAL.jpg

6.5M Surface Gas Tree Pre-Mob Testing

Assembly/Du.jpg

15M Surface Gas Tree Pre-Mob Testing
 
 

089.JPG

Completed Primary and Back-up Trees Pre-Mob

Hydro/Trees.jpg


5 1/8" 12M Surface Gas Tree Pre-Mob Testing
 Hydrostatic and Nitrogen Gas

456.JPG

Tubing Hanger Running Tool to Tubing Hanger Unitisation.
Followed by Hydrostatic and Nitrogen Gas Unitisation FAT 

Assembly/094.JPG

Assembly/096.JPG


Completed Tubing Hanger Running Tool to Tubing Hanger Unitisation.

Primary and Back-up ready for load out

Assembly/104.JPG


Tubing Hanger Running Tool to Tubing Hanger Unitisation.

Primary and Back-up FAT Complete and ready for load out

Assembly/103.JPG