HomeEquipment AssemblyHydrostatic TestingNitrogen Gas TestingRefurbishmentPre-Mob TestingSystem Integration Test (S.I.T.)QHSEContact Info

EMSTECH can offer System Integration Testing (S.I.T.) equipment stack-ups either inside or outsite with all services supplied.

Emergency Tubing Hanger Recovery Stack Up S.I.T.

1178.JPG

Multi-Bowl Wellhead System Stack Up

1173.JPG

Assembly/TRT.jpg

Subsea Tree Running Tool S.I.T. Stack Up


THROTFAT11.JPG

Intervention Landing String S.I.T.
Orientation setting with Tubing Hanger 
Interface separation Tubing Hanger tests.

1215.JPG

Surface Tree Stack up Interface S.I.T.

webassets/893.JPG

Intervention Landing String S.I.T.


Enter supporting content here