HomeEquipment AssemblyHydrostatic TestingNitrogen Gas TestingRefurbishmentPre-Mob TestingSystem Integration Test (S.I.T.)QHSEContact Info

Selection of Surface and Subsea equipment during nitrogen gas testing.

All equiment shown was fully assembled by EMSTECH assembly department

then hydro tested prior to gas testing.

H.P. Tubing Head Assembly

undefined
gas/TH1.jpg
undefined

10M Surface Xmas Tree

gas/GTT.jpg

Completed 12M Surface Tree

Assembly/237.JPG


Subsea T.R.T 6.5M Shear Valve

gas/TRT.jpg

15K Surface Xmas Tree

Hydro/Elgi.jpg