Our Assembly Department has a highly skilled, knowledgeable and diverse expertise.
Please see a small selection of equipment below.
 
Valves (Surface or Subsea)
Tubing Heads, Casing Spools, Multi-bowls
Xmas Trees
Tubing Hanger Running & Retrieval Tools (Surface or Subsea)
Tubing Hangers (Subsea or Surface) 
Universal Running Tools
Subsea Wellhead Connectors

Valve Assembly Area
 
Prior to assembly all parts are fully traced and recorded digitally. Valves are then fully assembled and tested with both customer and I.C.B. witness.

584.JPG

Actuated Gate Valves
Prior to assembly all parts are fully traced and recorded digitally.
Valves are then fully assembled and tested with both customer and I.C.B. witness.

773.JPG

Tubing Hanger Running Tool & Universal Running Tool Assemblies
All Running Tools recieved in kit part  form, all parts then traced and assembled as per
drawing BOM and function / pressure tested as per procedures.
 
Please click on picture to enlarge

URT/1815.JPG URT/1814.JPG URT/THRT.jpg URT/APT2.jpg
URT/APT1.jpg URT/1382.JPG URT/940.JPG URT/712.JPG
URT/2403.JPG URT/431.JPG URT/128.JPG URT/116.JPG
URT/115.JPG URT/074.JPG URT/028.JPG URT/1592.JPG
URT/1585a.JPG URT/302.JPG

056.jpg

Wireline BOP Pre Pipework manufacture

060.jpg

Wireline BOP Post Pipework manufacture


 Vertical Tubing Hanger Running Tool make up to Tubing Hanger

Vertical crown plug setting in either Tubing Hanger or Internal Tree Cap.

All make-ups performed on saftey elevated platform.

Overall height / length of vertical make-ups 40 Ft.

Following on from make-up, components can then be tested in our in-house test facility

Hydrostatic Test Bay can utilise components up to 60 Ft Long.

Nitrogen Gas Test Bay can utilise components up to 40 Ft Long

270.JPG

Subsea Wellhead Connector
Full assembly build including manufacture of all
hard pipe plumbing followed by full Factory
Acceptance Test procedure with customer and
I.C.B Witness.

685.JPG

009.JPG

15K Surface Tree full assembly build including all hard pipe

manufacture and electrical cable run installation.

Assembly/DBST.jpg

Dual Bore Surface Tree full assembly build and test from
component part form.